Loading...

Specification

Specification

 

Pathway

The base may only need to be compacted soil but local site conditions will dictate the final sub-base build-up. Use sharp sand to level up the ground. A permeable membrane may be laid under to deter weed growth.

 

 

Pedestrian and frequent vehicle traffic

Use sharp sand to smooth out undulation over a suitable compacted sub base (MOT type1 or similar) at a depth of 10 cm. A permeable membrane may be laid under to deter weed growth.

 

 

Heavy vehicle traffic

Lay sharp sand to smooth out undulations over a suitable compacted sub base (MOT type1 or similar) at a depth of 15 - 20 cm.

 

Products

Our Details

Cedar Nursery
Horsley Road
Cobham
Surrey
KT11 3JX

01932 862473 
sales@landscaping.co.uk

Opening Hours
Mon-Sat : 8.30am-5.30pm
Sun: 10.30am to 4.30pm