Specification
Specification
|
Pathway |
|
![]() |
The base may only need to be compacted soil but local site conditions will dictate the final sub-base build-up. Use sharp sand to level up the ground. A permeable membrane may be laid under to deter weed growth. |
|
Pedestrian and frequent vehicle traffic |
|
![]() |
Use sharp sand to smooth out undulation over a suitable compacted sub base (MOT type1 or similar) at a depth of 10 cm. A permeable membrane may be laid under to deter weed growth. |
|
Heavy vehicle traffic |
|
![]() |
Lay sharp sand to smooth out undulations over a suitable compacted sub base (MOT type1 or similar) at a depth of 15 - 20 cm. |
Products
Products
Our Details
|
Cedar Nursery
Opening Hours |
|



