Specification

Specification

Pathway

The base may only need to be compacted soil but local site conditions will dictate the final sub-base build-up. Use sharp sand to level up the ground. A permeable membrane may be laid under to deter weed growth.

Pedestrian and frequent vehicle traffic

Use sharp sand to smooth out undulation over a suitable compacted sub base (MOT type1 or similar) at a depth of 10 cm. A permeable membrane may be laid under to deter weed growth.

Heavy vehicle traffic

Lay sharp sand to smooth out undulations over a suitable compacted sub base (MOT type1 or similar) at a depth of 15 - 20 cm.