Pathway and occasional vehicle access
The base need only be compacted soil. Use sharp sand to level up the ground. A permeable membrane may be laid under to deter weed growth
Click to enlarge
Pedestrian and frequent vehicle traffic
Use sharp sand to smooth out undulation over a suitable compacted sub base at a depth of 10 cm. A permeable membrane may be laid under to deter weed growth
Click to enlarge
Heavy vehicle traffic
Lay sharp sand to smooth out undulations over a suitable compacted sub base at a depth of 15 - 20 cm.
Cedar Nursery
Horsley
Road
Cobham
Surrey
KT11 3JX, UK.